Transeast prides itself & its record in support of the mining, oil & gas, aggregate & geothermal sectors.
These pictures were taken of oil and gas trucks crossing the Kainuk bridge near Lake Turkana. Transeast designed the river crossing bridge as the nearby older bridge had been condemned by the authorities due to flood damage. Another example of innovative solutions to transport problems. This bridge is still operating today in support of the oil and gas sector in Kenya
Transeast provided specialized transport to move a 2500 hp exploration rig over rough terrain within Lake Turkana region
Transeast moved the SCR (switch control room) unit for a 2500 hp exploration rig using a hydraulic modular trailer within Lake Turkana region
Using a modular trailer Transeast moved a Sandvick LH621 underground unit from Mombasa port to DRC (Democratic Republic of the Congo)
Transeast transported 4 Wartsila engines from Mombasa port via Lake Victoria to a mine within Geita region in Tanzania
Transeast transported generators for the 2500 hp exploration rig within Lake Turkana region